I'm going to catch up for the whole week -- first my progress on my sock knitting. Still not finished with the second scrappy Frankensock, but a little more progress since last time I posted.
I've started the foot and hopefully I will finish it before the end of January.
I've also been busy getting some of the blocks put together into tops from the QOV Eastern Missouri Block Drive. A few are still trickling in to add to the 800+ I had received by the end of December. I arranged a sew day with three friends and we made a good start on the stack of blocks. Thanks to these ladies, I think we are approaching the half way mark.
Here are three finished tops with borders. More tops are made, but I am still searching my stash for border fabrics to add to each top to make them the appropriate size. They will finish approximately 60" x 80".
I'm determined to use more stash in 2017 and what better way than providing borders, bindings and pillowcases for all of these quilts from my stash as they are finished.!
| Pieced by Coleen |
| Pieced by Dar |
| Pieced by Dar |
The shelves don't look any less crowded, but I know there has been some fabric usage. I will post more finished tops after the borders are added.
Stash Report
Fabric Added this week - 1 FQ (gifted from guild President)
Fabric Used this week - 13.5 yards - a backing and borders cut for 6 QOV tops
YTD Added - 1 fat quarter
YTD Used - 19.25
Linking up with Judy's Patchwork Times.
What size border pieces did you cut for your QOVs? I may be able to help with something from my stash.
ReplyDeleteAll three tops look great - and what a boost for your stash report!
ReplyDeleteGorgeous QOVs! Congrats on the stash usage, pretty impressive numbers for so early in the year.
ReplyDeleteAll of these QOVs are just great! I love the blue accents in the border of Coleen's. And, what an interesting "bow tie" configuration in the one you pieced! You know I can help you with borders if need be!
ReplyDelete